Interventi reali · Sectors diversi · Lombardy

What we have fatto for customers.

A selection of real interventions carried out in the last 24 months for clients in Lombardy. All identifying details are anonymized out of respect for commercial confidentiality, but the contexts, technologies and results are faithful to reality.

Case 01 · Fintech · Milan

VMware 7 → 8 migration with vSAN, zero downtime business hours

Context and problem

Milan-based fintech software house in Lambrate, 45 employees. Obsolete VMware vSphere 7 environment on 3 HP DL380 Gen10 hosts, end-of-life SAN storage. Need for a refresh before the Broadcom deadline (End of General Support).

Solution adopted

Live migration to VMware vSphere 8 with HA cluster and vSAN ESA on 3 new HP DL380 Gen11 hosts, NVMe all-flash. DR site replication at a hosting partner in the Mecenate area.

Risultati KPI

  • Downtime business hours: 0 minuti
  • RTO target raggiunto: 15 minuti
  • Performance applicative: +35%
  • Total project time: 6 weeks + 2 weekends of execution
Case 02 · Manifatturiero · Bergamo

NIS2 compliance on a limited budget, fast timelines

Context and problem

Industrial weaving mill in Val Seriana, 130 employees. Post-NIS2 internal audit: zero segregation, unmanaged local passwords, non-existent logs. Management concerned about regulatory deadlines and limited budget.

Solution adopted

Introduction of Microsoft Entra ID with Business Premium plan, EDR Microsoft Defender for Business, Veeam Backup & Replication with immutable copy on Wasabi object storage, centralized logs with Wazuh open source. Internal training of the IT contact.

Risultati KPI

  • Compliance NIS2 raggiunta: 4 mesi
  • One-off investment: < 30k€
  • Annual management: €8k
  • Internal post-project audit: zero major non-conformities
Case 03 · Private healthcare · Segrate

Legacy PACS-RIS → enterprise storage server, NIS2 healthcare

Context and problem

Private medical clinic in Segrate, 25 doctors, legacy PACS-RIS server on an obsolete HP DL380 Gen8. Radiology image storage of 14 TB growing 3 TB/year, no redundancy, no DR replication. Healthcare NIS2 audit upcoming.

Solution adopted

Replacement with HPE Apollo 4200 Gen11 (dedicated storage server), 60 SAS 4 TB disks in RAID 60, continuous replication to the secondary San Donato site. SSO MFA, EDR, centralised logs.

Risultati KPI

  • RPO raggiunto: 5 minuti
  • RTO raggiunto: 10 minuti
  • Capacity for the next 5 years: guaranteed
  • NIS2 healthcare audit: passed
Case 04 · Logistica · Lodi

WMS saturo: SQL Server 2016 → 2022 + NVMe, performance recuperate

Context and problem

Logistics operator in San Zenone al Lambro, 80 staff, Manhattan SCALE WMS on a saturated SQL Server 2016. Slowdowns between 9-12 and 14-18 with thousands of picks/hour, operator errors and shipping delays.

Solution adopted

Migration to SQL Server 2022 + 256 GB RAM sizing on new Dell R660xs server with NVMe in RAID 10 + separate tempdb. Index optimization, statistics, automatic maintenance.

Risultati KPI

  • Tempo medio query WMS: -85%
  • Operator errors due to slowness: 0
  • ROI ricavato: 14 mesi
  • System handles Christmas peaks without degradation
Case 05 · Agroalimentare · Cremona

Dairy plant: legacy server at end of life, express rebuild

Context and problem

Cooperative dairy in the Cremona area, 23 supplying farms, production of 50,000 wheels of Grana Padano/year. Stim-Stalla management server on a single 12-year-old physical server with a SATA disk in degraded RAID 5. Imminent failure.

Solution adopted

Express replacement with HPE ProLiant DL325 Gen11 AMD EPYC, 64 GB DDR5 ECC, NVMe RAID 1 + SAS RAID 10 for historical archive. PostgreSQL migration with dump-restore in a weekend window.

Risultati KPI

  • Downtime: 4 ore (weekend programmato)
  • AOP audit successfully completed post-project
  • Sicurezza alimentare salvaguardata
  • Tempo chiusura ordini: -60%
Case 06 · Turismo · Bormio (SO)

Hotel PMS that survived a server-room flood

Context and problem

4-star hotel in Bormio, 90 rooms, Protel PMS on a physical server in a damp basement. Partial flooding in May 2024 (sirocco + melted snow at altitude). Summer season looming.

Solution adopted

Server saved at the last minute, data recovered from the nightly backup on a Synology NAS. Server relocated to the first floor in a dedicated cabinet with split air conditioning, dual APC UPS with SNMP monitoring. Migration to 100% standard remote assistance (3h from Melzo is excessive for emergencies).

Risultati KPI

  • Summer season 2024: no downtime
  • Availability in subsequent seasons: 99.95%
  • Remote response time: 5 minutes
  • Costo intervento totale: < 12k€

⚠ All cases presented are based on actual interventions carried out over the last 24 months. Names, addresses and identifying details have been anonymized out of respect for commercial confidentiality. Technical contexts, KPIs and timelines are true to reality.

Volete un progetto simile?

Tell us about your case →
Let's talk

Ready to talk with a systems engineer?

You will always be answered by a technician, never a call centre.

02 95 17 550